Grand Maraetai Retreat with Designer Finishes
USD $1,472,583
120 Maraetai School Road, Maraetai, Auckland, 2018, New Zealand
Listed by: Jessie Stewart | Barfoot & Thompson
Welcome to 120 Maraetai School Road, in magical Maraetai. Perfectly positioned to capture sea views across the Hauraki Gulf out to Rangitoto Island, this spectacular brand-new home has been built with design and luxury in mind. Step inside the gorgeous grand entrance foyer to discover lavish living, starting with a glass door lift to take you to the first floor. Instantly impressive, you’ll find high stud ceilings of 2.7m on the ground floor, and 3m on the first floor. An expansive 343m2, it is evident that this home has been meticulously crafted to maximise space and sea views throughout. The first-floor living is open plan and opulent, featuring a beautiful modern kitchen with high quality appliances and a large living and dining area centred by a statement gas fireplace. This effortless entertainment area flows seamlessly out to the front balcony and back deck - enjoy outdoor living that is surrounded by stylish, easy-care landscaping and a feature water fountain.On the ground floor, there is a separate spacious living area with wet bar, ample storage and a double internal access garage with a second driveway ideal to fit a boat or motorhome – here you have space for the whole family, and all their toys!Four luxurious bedrooms across the two floors complete the picture, three of them with ensuite bathrooms and statement walk-in wardrobes.Located just moments from local beaches, shops, eateries, walkways, Formosa golf course and Pine Harbour Marina with ferry services to the CBD.If you are looking for a simply stunning new home with the best of the beautiful Pohutakawa Coast on your doorstep, then you are going to love calling this Maraetai Masterpiece HOME.Contact us today!
Highlights:
Glass door lift to first floor
Statement gas fireplace
Expansive front balcony and back deck
Listed by Jessie Stewart | Barfoot & Thompson
Highlights:
Glass door lift to first floor
Statement gas fireplace
Expansive front balcony and back deck
Stylish and easy-care landscaping
Feature water fountain
Wet bar in separate living area
Double internal access garage with second driveway
Three ensuite bathrooms
Statement walk-in wardrobes
Close to local beaches and marina