Beds:3
Baths:2 Full | 1 Half

6577 Bennett Valley Road, Santa Rosa, California, 95404, USA

Listed by: Rachel Hazlett-Karr | Vanguard Properties

Nestled on nearly 4 pristine acres just outside Santa Rosa, this stunning property offers the best of Sonoma County living, where high-end craftsmanship meets open space and modern luxury blends with nature. The extensively remodeled main home features Sierra Pacific windows, engineered hardwood floors, custom woodwork, and Levolor blinds. The chef's kitchen includes granite countertops, a maple butcher block island sourced from Kentucky, Sub-Zero fridge, Wolf range, Viking dishwasher, and a huge walk-in pantry - all centered around a dramatic Extraordinaire fireplace. Outside, you'll find: A newer shop, ideal for guests, rental, or creative use Immaculate breezeway barn with 4 stalls, tack room, wash rack, and storage loft RV hookups with water, power, and septic 3-car garage, dog kennels, and two sheds Fruit trees and wide-open skies complete the scene. Infrastructure includes a 5,000-gallon water tank with new pump house, 400-amp power, freshly paved driveway, and a $200K+ drainage system by Adobe Associates and a backup generator that powers everything in the house, shop, barn, and property! Whether you're an equestrian, hobbyist, or remote-working dreamer, this is a retreat with room to grow.
Show More Show Less

Nestled on nearly 4 pristine acres just outside Santa Rosa, this stunning property offers the best of Sonoma County living, where high-end craftsmanship meets open space and modern luxury blends with nature. The extensively remodeled main home features Sierra Pacific windows, engineered hardwood floors, custom woodwork, and Levolor blinds. The chef's kitchen includes granite countertops, a maple butcher block island sourced from Kentucky, Sub-Zero fridge, Wolf range, Viking dishwasher, and a huge walk-in pantry - all centered around a dramatic Extraordinaire fireplace. Outside, you'll find: A newer shop, ideal for guests, rental, or creative use Immaculate breezeway barn with 4 stalls, tack room, wash rack, and storage loft RV hookups with water, power, and septic 3-car garage, dog kennels, and two sheds Fruit trees and wide-open skies complete the scene. Infrastructure includes a 5,000-gallon water tank with new pump house, 400-amp power, freshly paved driveway, and a $200K+ drainage system by Adobe Associates and a backup generator that powers everything in the house, shop, barn, and property! Whether you're an equestrian, hobbyist, or remote-working dreamer, this is a retreat with room to grow.

Highlights:

  • Sierra Pacific windows

  • Engineered hardwood floors

  • Custom woodwork

  • Chef's kitchen with granite countertops

  • Extraordinaire fireplace

  • Immaculate breezeway barn with 4 stalls

  • RV hookups

  • 3-car garage

  • Fruit trees

  • 5,000-gallon water tank

  • Show More Show Less
Reference ID:325052085 Web ID:dklw

Listed by Rachel Hazlett-Karr | Vanguard Properties

Contact email form:

Highlights:

  • Sierra Pacific windows

  • Engineered hardwood floors

  • Custom woodwork

  • Chef's kitchen with granite countertops

  • Extraordinaire fireplace

  • Immaculate breezeway barn with 4 stalls

  • RV hookups

  • 3-car garage

  • Fruit trees

  • 5,000-gallon water tank

Continue Exploring Related Collections