Beds:7
Baths:5 Full | 2 Half

Milton, Georgia, USA

Listed by: Veronica Bangsboll | Ansley Real Estate - Christie’s International Real Estate

Step into refined luxury with this exceptional custom-built home nestled beside a 160-acre protected nature preserve. Designed with both everyday living and upscale entertaining in mind, the main level features expansive open-concept living, a show-stopping 17-foot kitchen island, top-of-the-line Thermador appliances, and both a walk-in and butler's pantry. Multiple dining areas create the ideal space for hosting in style. Upstairs, the private primary suite is a luxurious retreat offering dual walk-in closets, a dedicated laundry space, and a spa-like ensuite with elegant Carrara marble finishes. Spacious secondary bedrooms ensure comfort and privacy for family or guests. The finished terrace level is an entertainer's dream-complete with a custom wine room, illuminated bar cabinetry, beverage refrigeration, and direct access to a covered outdoor patio. Relax fireside under the stone fireplace with overhead heating, creating a cozy outdoor living space to enjoy year-round. Movie lovers will appreciate the fully equipped home theater with a 130-inch screen and tiered seating for an immersive experience. Recent updates include fresh exterior paint, a new HVAC system, and rear gutter guards. Surrounded by lush, thoughtfully maintained landscaping in a peaceful community, this home is the perfect blend of high-end finishes and natural serenity. Discover an unmatched lifestyle in this extraordinary property.
Show More Show Less

Step into refined luxury with this exceptional custom-built home nestled beside a 160-acre protected nature preserve. Designed with both everyday living and upscale entertaining in mind, the main level features expansive open-concept living, a show-stopping 17-foot kitchen island, top-of-the-line Thermador appliances, and both a walk-in and butler's pantry. Multiple dining areas create the ideal space for hosting in style. Upstairs, the private primary suite is a luxurious retreat offering dual walk-in closets, a dedicated laundry space, and a spa-like ensuite with elegant Carrara marble finishes. Spacious secondary bedrooms ensure comfort and privacy for family or guests. The finished terrace level is an entertainer's dream-complete with a custom wine room, illuminated bar cabinetry, beverage refrigeration, and direct access to a covered outdoor patio. Relax fireside under the stone fireplace with overhead heating, creating a cozy outdoor living space to enjoy year-round. Movie lovers will appreciate the fully equipped home theater with a 130-inch screen and tiered seating for an immersive experience. Recent updates include fresh exterior paint, a new HVAC system, and rear gutter guards. Surrounded by lush, thoughtfully maintained landscaping in a peaceful community, this home is the perfect blend of high-end finishes and natural serenity. Discover an unmatched lifestyle in this extraordinary property.

Highlights:

  • Custom-built home

  • 17-foot kitchen island

  • Thermador appliances

  • Wine room

  • Stone fireplace

  • Outdoor living space

  • Home theater

  • Spa-like ensuite

  • Butlers pantry

  • Covered outdoor patio

  • Show More Show Less
Walk-Thru
Reference ID:7589946 Web ID:zntt

Listed by Veronica Bangsboll | Ansley Real Estate - Christie’s International Real Estate

Contact email form:

Highlights:

  • Custom-built home

  • 17-foot kitchen island

  • Thermador appliances

  • Wine room

  • Stone fireplace

  • Outdoor living space

  • Home theater

  • Spa-like ensuite

  • Butlers pantry

  • Covered outdoor patio