Beds:4
Baths:
4
Full
|
1
Half
|
0
Quarter
|
0
Three Quarter
155 South Bradford Court, Lake Forest, Illinois, 60045, USA Listed by: Cathy Kendall | @properties Christie’s International Real Estate
This custom Windsor model in Stonebridge is for the buyer who wants maintenance-free living and is downsizing but still needs plenty of room for their belongings and keepsakes, plus the ability to host large family gatherings. Ideally located with a deck overlooking woods adjacent to Townline Community Park with over 3,200 sq. ft. A dramatic 2 story foyer welcomes you to rich dark hardwood floors, custom moldings and millwork, volume ceilings, surround sound, and a noteworthy staircase. Entertain with ease in the Great room with tray ceiling and fieldstone surround gas fireplace that flows to the spacious dining room. Gourmet cooks will love the high-end kitchen featuring Viking, Bosch, & Jenn Air appliances; oversized granite island/breakfast bar, separate pantry closets with lighted artistic glass fronts, wet bar, and breakfast room with sliders to the outdoors. 1st floor primary suite is tucked away next to the bay window study, highlighting 2 walk-in closets and a luxurious spa bathroom. Great 1st floor mud/laundry room with a huge Kohler, 2 faucets, pedestal, farm sink and tons of storage in the beautiful cabinetry built-ins. 2nd floor has 2 bedrooms ensuite. An additional 2,421 sq. ft .(ideal for any live-in situation) can be found in the basement, showcasing a family/media room, game room, 4th bedroom, full bath, office (could be 5th bedroom), wine cellar, wet bar, cedar closet & storage. This one owner home after closing had an incredible amount of money spent on designer custom upgrades. Property is an estate being sold "As Is".
Show More Show Less

This custom Windsor model in Stonebridge is for the buyer who wants maintenance-free living and is downsizing but still needs plenty of room for their belongings and keepsakes, plus the ability to host large family gatherings. Ideally located with a deck overlooking woods adjacent to Townline Community Park with over 3,200 sq. ft. A dramatic 2 story foyer welcomes you to rich dark hardwood floors, custom moldings and millwork, volume ceilings, surround sound, and a noteworthy staircase. Entertain with ease in the Great room with tray ceiling and fieldstone surround gas fireplace that flows to the spacious dining room. Gourmet cooks will love the high-end kitchen featuring Viking, Bosch, & Jenn Air appliances; oversized granite island/breakfast bar, separate pantry closets with lighted artistic glass fronts, wet bar, and breakfast room with sliders to the outdoors. 1st floor primary suite is tucked away next to the bay window study, highlighting 2 walk-in closets and a luxurious spa bathroom. Great 1st floor mud/laundry room with a huge Kohler, 2 faucets, pedestal, farm sink and tons of storage in the beautiful cabinetry built-ins. 2nd floor has 2 bedrooms ensuite. An additional 2,421 sq. ft .(ideal for any live-in situation) can be found in the basement, showcasing a family/media room, game room, 4th bedroom, full bath, office (could be 5th bedroom), wine cellar, wet bar, cedar closet & storage. This one owner home after closing had an incredible amount of money spent on designer custom upgrades. Property is an estate being sold "As Is".

Reference ID:12206206 Web ID:bdak

Highlights:

  • Custom moldings and millwork
  • Fieldstone surround gas fireplace
  • High-end gourmet kitchen with Viking & Bosch appliances
  • Luxurious spa bathroom
  • Surround sound system
  • Show More Show Less
Walk-Thru
Contact Cathy Kendall | @properties Christie’s International Real Estate

Highlights:

  • Custom moldings and millwork
  • Fieldstone surround gas fireplace
  • High-end gourmet kitchen with Viking & Bosch appliances
  • Luxurious spa bathroom
  • Surround sound system