Bright and Airy Home with Pool and Spa
684 98th Avenue North, Naples, Florida, 34108, USA
Listed by: Mari Vesci | John R. Wood Christie’s International Real Estate
Bright and airy 3 bedroom plus den home with heated pool and spa! Open-concept design with 1,702 sq ft of coastal living space and double car garage. Only a short bike ride to the beach! High ceilings and large windows create an open, inviting atmosphere throughout. Light interior complements the coastal-inspired feel with tile and real wood floors throughout. Open kitchen with island and new stainless steel appliances seamlessly flows into living and dining areas-ideal for entertaining. Sliding glass doors in living room open to a covered screened-in lanai, providing easy access to the outdoor living area. Generously sized primary suite features sliding glass doors to the lanai, while the two additional bedrooms each offer ample space with access to the guest bath. The Den is perfect for a home office or flex space. Utility room with washer and dryer has additional storage. Meticulously cared for home. Enjoy southern exposure, where the pool and spa are bathed in sunlight all day! Pool cage enhances the outdoor space, providing a great setting for relaxation and entertaining. High and dry in flood zone X, storm shutters, and brand-new community water lines offer peace of mind for years to come. Furniture is negotiable, making this a great turnkey opportunity. Ideally located for those seeking both relaxation and convenience. Minutes to Pavilion shopping & Mercato, with an array of shopping, dining, and entertainment options, including Whole Foods. Short bike ride to Vanderbilt Beach, one of the best places to catch breathtaking sunsets, or explore Delnor-Wiggins Pass State Park for a chance to experience Florida wildlife. Additionally, enjoy luxury resort living at the nearby Ritz Carlton and La Playa Beach & Golf Resort. Experience the best of Naples living with this beautiful home, perfectly situated to enjoy all the area has to offer.
Highlights:
Heated pool and spa
High ceilings with large windows
Coastal-inspired tile and wood floors
Listed by Mari Vesci | John R. Wood Christie’s International Real Estate
Highlights:
Heated pool and spa
High ceilings with large windows
Coastal-inspired tile and wood floors
Open kitchen with island
Covered screened-in lanai
Southern exposure for pool and spa
Pool cage for outdoor relaxation
Storm shutters for peace of mind
Proximity to Vanderbilt Beach
Nearby luxury resort amenities