Exquisite Property on a Quiet Cul-de-sac
Priced almost $300,000 below recent appraised value, this bank-owned home is priced for whatever updates one would like to do. This exquisite property is nestled on a quiet cul-de-sac in one of Argyles most sought-after neighborhoods. Step inside to discover a spacious open floor plan featuring high ceilings, rich hardwood floors, and an abundance of natural light. The gourmet kitchen is a chefs dream with granite countertops, stainless steel appliances, and custom cabinetry. The expansive living room centers around a cozy stone fireplace, creating a warm and inviting atmosphere. With 4 bedrooms and 4.1 bathrooms, this home offers flexibility for families of all sizes, including a luxurious primary suite with a spa-like bath featuring a soaking tub, walk-in shower, and oversized walk-in closet. Additional bedrooms are generously sized, and a dedicated home office provides extra space for work or play. Entertainment is a breeze with a game room complete with a built-in bar. Just steps away, a media room delivers a true cinematic experience right at home. Adding to the appeal, there is a 622 sq ft apartment above the garage, which includes a full kitchen, bedroom, full bath, and living area, along with a stackable washer and dryerideal for guests or rental potential. Size of apartment is not added into total size of home, nor is the bedroom count added to the total. Step outside to your private backyard retreatdesigned for both relaxation and entertaining. The outdoor living space boasts a built-in kitchen, a fireplace, and a covered patio perfect for year-round enjoyment. Cool off in the sparkling pool, unwind in the attached spa, or gather around the firepit under the stars. A lush, grassed yard offers room to play, and tucked into the trees, a charming kids fort provides a magical hideaway. Bank can close quickly. No known issues that would cause someone to not be able to get a loan.
Highlights:
- High ceilings
- Rich hardwood floors
- Gourmet kitchen with granite countertops
Highlights:
- High ceilings
- Rich hardwood floors
- Gourmet kitchen with granite countertops
- Cozy stone fireplace
- Luxurious primary suite with spa-like bath
- Built-in bar in game room
- Media room for cinematic experience
- Outdoor kitchen with fireplace
- Sparkling pool with attached spa
- Charming kids fort in the lush yard