Beds: 3
Baths: 2 Full | 2 Half
10730 204th Avenue Southeast, Snohomish, Washington, 98290, USA Listed by: Pete Keating | John L. Scott Real Estate
Experience single-level luxury living at its finest in the highly sought-after Hidden Ridge community! Step into a grand cathedral entry that opens to elegant formal living and dining spaces, highlighted by exquisite millwork and expansive windows. The heart of the home is the stunning great room with a cozy gas fireplace, flowing seamlessly into a chef's kitchen with granite countertops, an oversized island with bar seating, and sleek SS appliances--including a gas range. Upstairs, retreat to the spacious flex room with a 3/4 Bath attached. Would make a perfect mother in law or guest suite. Main floor office, too! Outside, enjoy a shy 1-acre fully landscaped parcel backing to a greenbelt for added privacy. A huge 3-car garage, RV parking.
Show More Show Less

Experience single-level luxury living at its finest in the highly sought-after Hidden Ridge community! Step into a grand cathedral entry that opens to elegant formal living and dining spaces, highlighted by exquisite millwork and expansive windows. The heart of the home is the stunning great room with a cozy gas fireplace, flowing seamlessly into a chef's kitchen with granite countertops, an oversized island with bar seating, and sleek SS appliances--including a gas range. Upstairs, retreat to the spacious flex room with a 3/4 Bath attached. Would make a perfect mother in law or guest suite. Main floor office, too! Outside, enjoy a shy 1-acre fully landscaped parcel backing to a greenbelt for added privacy. A huge 3-car garage, RV parking.

Highlights:

  • Cathedral entry with elegant formal spaces
  • Stunning great room with cozy gas fireplace
  • Chef's kitchen with granite countertops and oversized island
  • Spacious flex room with attached 3/4 bath
  • Main floor office
  • Shy 1-acre fully landscaped parcel
  • Backing to a greenbelt for added privacy
  • Huge 3-car garage
  • RV parking
  • Show More Show Less
Reference ID: 2356364 Web ID: jaqt
Listed by Pete Keating | John L. Scott Real Estate
Contact by phone:  425-418-4191
Contact email form:

Highlights:

  • Cathedral entry with elegant formal spaces
  • Stunning great room with cozy gas fireplace
  • Chef's kitchen with granite countertops and oversized island
  • Spacious flex room with attached 3/4 bath
  • Main floor office
  • Shy 1-acre fully landscaped parcel
  • Backing to a greenbelt for added privacy
  • Huge 3-car garage
  • RV parking