Beds: 4
Baths: 4 Full | 1 Half
869 High Mountain Road, Franklin Lakes, New Jersey, 07417, USA Listed by: Mimma Andriuolo | Weichert Realtors
This pristine 4 bedroom/4.5 bath sprawling ranch exemplifies true pride of ownership on an acre of professionally manicured property. Truly a rare offering in today's market, this home boasts three private en suite bedrooms, with the primary suite being especially exceptional. The primary en suite is generously sized featuring a sitting area with a gas fireplace, two window seats with built-ins, abundant natural light, views of the pool, and features an expansive oversized closet, with additional closets and separate laundry area too! Open concept layout is ideal for gatherings. Family room has a vaulted ceiling and access to deck and gunite, heated pool with waterfall. There is an upper level finished bonus room too! Oversized finished basement and a lot of storage space too! As a super bonus, the property includes a path leading to a dead-end street at the rear providing even more enhanced privacy! 2- car garage! A truly remarkable home!
Show More Show Less

This pristine 4 bedroom/4.5 bath sprawling ranch exemplifies true pride of ownership on an acre of professionally manicured property. Truly a rare offering in today's market, this home boasts three private en suite bedrooms, with the primary suite being especially exceptional. The primary en suite is generously sized featuring a sitting area with a gas fireplace, two window seats with built-ins, abundant natural light, views of the pool, and features an expansive oversized closet, with additional closets and separate laundry area too! Open concept layout is ideal for gatherings. Family room has a vaulted ceiling and access to deck and gunite, heated pool with waterfall. There is an upper level finished bonus room too! Oversized finished basement and a lot of storage space too! As a super bonus, the property includes a path leading to a dead-end street at the rear providing even more enhanced privacy! 2- car garage! A truly remarkable home!

Highlights:

  • Gas fireplace with sitting area
  • Vaulted ceiling in family room
  • Gunite, heated pool with waterfall
  • Expansive oversized closet in primary suite
  • Upper level finished bonus room
  • Show More Show Less
Reference ID: 25007171 Web ID: fhjm
Listed by Mimma Andriuolo | Weichert Realtors
Contact by phone:  2018198128
Contact email form:

Highlights:

  • Gas fireplace with sitting area
  • Vaulted ceiling in family room
  • Gunite, heated pool with waterfall
  • Expansive oversized closet in primary suite
  • Upper level finished bonus room