Extensively Updated and Meticulously Maintained Home
1319 North Oakley Boulevard, Chicago, Illinois, 60622, USA
Listed by: Bruce Glazer | @properties Christie’s International Real Estate
Move right in to this extensively updated and meticulously maintained 4 bed / 3.1 bath single family home on a tree-lined block in the heart of Wicker Park. Set back from the street for added privacy and curb appeal, this home combines timeless character with modern finishes throughout. The spacious main level features hardwood floors, custom built-ins, crown molding, and large windows that flood the space with natural light. The open-concept living and dining areas easily accommodate full-sized furniture and a formal dining setup. The kitchen is equipped with Viking and Bosch stainless steel appliances, refinished 42" cabinets (2024), under-cabinet lighting, a breakfast bar, pantry, and a charming built-in breakfast nook with bench seating and storage (2020). Upstairs, you'll find three generously sized bedrooms, two full bathrooms, and a full laundry room. The primary suite includes elegant wainscoting and crown molding (2024), a spacious walk-in closet with Elfa shelving (2021), and a luxurious en-suite bathroom featuring a dual vanity, large walk-in shower with frameless glass doors, and designer finishes (2022). Both secondary bedrooms are enhanced with custom Elfa closet systems and share an updated hall bathroom. Additional upstairs upgrades include linen shelving (2023), custom window treatments (2024), and dimmable lighting throughout (2023). The fully finished basement was completely renovated in 2023 and offers radiant heated floors, plush new carpeting, a large family/media room with built-in entertainment center and fireplace, a custom hardwood bar and desk, a fourth bedroom with custom shelving, and a fully updated bathroom-perfect for guests or extended living. System updates include two Bosch A/C units (2022), two new Carrier furnaces (2025), and a new washer, dryer, and microwave (2024). Outdoor enhancements include a refinished and painted back deck (2024), new backyard sod and planters (2023), low-maintenance turf in the front yard (2021), and security upgrades to the front gate and door. Located just blocks from Division Street's vibrant dining and shopping, Pritzker Elementary, Wicker Park, and multiple playgrounds, this home is part of a close-knit block with an active community and annual events. A rare opportunity to own a turnkey home in one of Chicago's most desirable neighborhoods.
Highlights:
Hardwood floors
Custom built-ins
Viking & Bosch appliances
Listed by Bruce Glazer | @properties Christie’s International Real Estate
Highlights:
Hardwood floors
Custom built-ins
Viking & Bosch appliances
Spacious walk-in closet
Custom Elfa closet systems
Full laundry room
Radiant heated floors
Dual vanity
Frameless glass shower
Built-in breakfast nook