Beds: 4
Baths:
1
Full
|
2
Half
|
0
Quarter
|
0
Three Quarter
117 Water Street, Chelan, Washington, 98816, USA Listed by: Arturo Zavala | Windermere Real Estate - Mountain West
Fine waterfront living from this updated Lakeside home in the coveted Lake Park Block w/ low bank sandy beach waterfront access & shared PUD dock. Lakeside south shore bay is an iconic timepiece that offers the best sandy beach harbor during the summer months and a sandbar peninsula in the winter months. Sit out on your deck and enjoy the Lady of the Lake pass by the Chelan Bay, and take in the morning sunrise from this fully remodeled 4bed, 2.5bath, 2-story, 2-car garage home on a generous corner lot w/ extended RV/Boat parking. Interior features a newly completed kitchen w/ SS appliances, granite counters, shaker cabinets, LVP flooring, fresh paint & trim, updated light & plumbing fixtures, & beachy themed decor.
Show More Show Less

Fine waterfront living from this updated Lakeside home in the coveted Lake Park Block w/ low bank sandy beach waterfront access & shared PUD dock. Lakeside south shore bay is an iconic timepiece that offers the best sandy beach harbor during the summer months and a sandbar peninsula in the winter months. Sit out on your deck and enjoy the Lady of the Lake pass by the Chelan Bay, and take in the morning sunrise from this fully remodeled 4bed, 2.5bath, 2-story, 2-car garage home on a generous corner lot w/ extended RV/Boat parking. Interior features a newly completed kitchen w/ SS appliances, granite counters, shaker cabinets, LVP flooring, fresh paint & trim, updated light & plumbing fixtures, & beachy themed decor.

Highlights:

  • Low bank sandy beach waterfront access
  • Shared PUD dock Iconic lakeside south shore bay
  • Sandbar peninsula Deck with Lady of the Lake views
  • Morning sunrise Fully remodeled with upscale kitchen
  • SS appliances Granite counters
  • Shaker cabinets
  • LVP flooring Fresh paint & trim
  • Updated light & plumbing fixtures
  • Show More Show Less
Reference ID: 2354356 Web ID: rlno
Contact Arturo Zavala | Windermere Real Estate - Mountain West

Highlights:

  • Low bank sandy beach waterfront access
  • Shared PUD dock Iconic lakeside south shore bay
  • Sandbar peninsula Deck with Lady of the Lake views
  • Morning sunrise Fully remodeled with upscale kitchen
  • SS appliances Granite counters
  • Shaker cabinets
  • LVP flooring Fresh paint & trim
  • Updated light & plumbing fixtures
Continue Exploring Related Collections