Beds: 3
Baths: 2 Full
684 98th Avenue North, Naples, Florida, 34108, USA Listed by: Mari Vesci | John R. Wood Christie’s International Real Estate
Bright and airy 3 bedroom plus den home with heated pool and spa! Open-concept design with 1,702 sq ft of coastal living space and double car garage. Only a short bike ride to the beach! High ceilings and large windows create an open, inviting atmosphere throughout. Light interior complements the coastal-inspired feel with tile and real wood floors throughout. Open kitchen with island and new stainless steel appliances seamlessly flows into living and dining areas-ideal for entertaining. Sliding glass doors in living room open to a covered screened-in lanai, providing easy access to the outdoor living area. Generously sized primary suite features sliding glass doors to the lanai, while the two additional bedrooms each offer ample space with access to the guest bath. The Den is perfect for a home office or flex space. Utility room with washer and dryer has additional storage. Meticulously cared for home. Enjoy southern exposure, where the pool and spa are bathed in sunlight all day! Pool cage enhances the outdoor space, providing a great setting for relaxation and entertaining. High and dry in flood zone X, storm shutters, and brand-new community water lines offer peace of mind for years to come. Furniture is negotiable, making this a great turnkey opportunity. Ideally located for those seeking both relaxation and convenience. Minutes to Pavilion shopping & Mercato, with an array of shopping, dining, and entertainment options, including Whole Foods. Short bike ride to Vanderbilt Beach, one of the best places to catch breathtaking sunsets, or explore Delnor-Wiggins Pass State Park for a chance to experience Florida wildlife. Additionally, enjoy luxury resort living at the nearby Ritz Carlton and La Playa Beach & Golf Resort. Experience the best of Naples living with this beautiful home, perfectly situated to enjoy all the area has to offer.
Show More Show Less

Bright and airy 3 bedroom plus den home with heated pool and spa! Open-concept design with 1,702 sq ft of coastal living space and double car garage. Only a short bike ride to the beach! High ceilings and large windows create an open, inviting atmosphere throughout. Light interior complements the coastal-inspired feel with tile and real wood floors throughout. Open kitchen with island and new stainless steel appliances seamlessly flows into living and dining areas-ideal for entertaining. Sliding glass doors in living room open to a covered screened-in lanai, providing easy access to the outdoor living area. Generously sized primary suite features sliding glass doors to the lanai, while the two additional bedrooms each offer ample space with access to the guest bath. The Den is perfect for a home office or flex space. Utility room with washer and dryer has additional storage. Meticulously cared for home. Enjoy southern exposure, where the pool and spa are bathed in sunlight all day! Pool cage enhances the outdoor space, providing a great setting for relaxation and entertaining. High and dry in flood zone X, storm shutters, and brand-new community water lines offer peace of mind for years to come. Furniture is negotiable, making this a great turnkey opportunity. Ideally located for those seeking both relaxation and convenience. Minutes to Pavilion shopping & Mercato, with an array of shopping, dining, and entertainment options, including Whole Foods. Short bike ride to Vanderbilt Beach, one of the best places to catch breathtaking sunsets, or explore Delnor-Wiggins Pass State Park for a chance to experience Florida wildlife. Additionally, enjoy luxury resort living at the nearby Ritz Carlton and La Playa Beach & Golf Resort. Experience the best of Naples living with this beautiful home, perfectly situated to enjoy all the area has to offer.

Highlights:

  • Heated pool and spa
  • High ceilings with large windows
  • Coastal-inspired tile and wood floors
  • Open kitchen with island
  • Covered screened-in lanai
  • Southern exposure for pool and spa
  • Pool cage for outdoor relaxation
  • Storm shutters for peace of mind
  • Proximity to Vanderbilt Beach
  • Nearby luxury resort amenities
  • Show More Show Less
Walk-Thru
Reference ID: 225015219 Web ID: nrxo
Listed by Mari Vesci | John R. Wood Christie’s International Real Estate
Contact email form:

Highlights:

  • Heated pool and spa
  • High ceilings with large windows
  • Coastal-inspired tile and wood floors
  • Open kitchen with island
  • Covered screened-in lanai
  • Southern exposure for pool and spa
  • Pool cage for outdoor relaxation
  • Storm shutters for peace of mind
  • Proximity to Vanderbilt Beach
  • Nearby luxury resort amenities
Continue Exploring Related Collections